| CONTENTS
|
215.2 -- Minimum Rating and Size
Do-It-Yourself
Disaster
What's
Wrong
Here?
Code Q&A
Code Quiz
Faces of the Code
A Place of Their
Own
|
|
About this Newsletter
|
This twice-a-month e-newsletter is brought to you from the
publisher of EC&M magazine. CodeWatch will:
Let you know what could be changing in the Code®.
Help you brush up on your ability to apply the Code®.
Test your knowledge of the Code® with a Q&A format.
Introduce you to the people who vote on the rule changes.
Provide information on upcoming Code® seminars and shows.
Give you an opportunity to sound off on Code®-related issues.
We want to make sure we're providing you with the content you need to
better manage your business or enhance your technical skills. E-mail us and
let us know what you want to see in future issues of this e-newsletter.
We will do our best to address your request in a future issue of
CodeWatch.
|
Subscriptions
|
|
To sign up
for your free subscription, click here: Subscribe
To unsubscribe from this newsletter click here: Unsubscribe
To get this newsletter in a different format (Text, AOL or HTML),
or to change your e-mail address, please visit your profile page to change your delivery
preferences.
|
Back Issues
|
|
Missed an
issue? Visit the
CodeWatch archive on EC&M's Web site.
|
Tell a friend about CodeWatch
|
|
Do you know
of someone who'd like to receive CodeWatch? Visit the subscriber site, enter their e-mail
address and spread the wealth!
|
Advertising
|
To find out
how to advertise in this newsletter, e-mail David Miller or call
him
at (312) 840-8497.
The designations "National Electrical Code” and “NEC” refer to the
National Electrical Code®, which is a registered trademark of the
National Fire Protection Association.
|
| | | | |
|
Top 2005 Code Changes
215.2 -- Minimum
Rating and Size
By Mike Holt
A new sentence requires the feeder grounded (neutral)
conductor to be sized so that it has adequate fault-current capacity in
the event a short circuit occurs between an ungrounded conductor and
grounded (neutral) conductor. See 215.3 for the sizing requirements of
the feeder overcurrent protection device for continuous and
noncontinuous loads.
What the Code says:
(A) Feeders Not More Than 600V
(1) General. The minimum feeder-circuit
conductor size, before the application of any adjustment or correction
factors, must be no less than 125 percent of the continuous loads, plus
100 percent of the noncontinuous load based on the terminal temperature
rating ampacities as listed in Table 310.16 [110.14(C)].
(Text new to the Code is underlined.)
Behind the change: Load calculations often result in a
grounded (neutral) conductor that is very small in comparison to the
ungrounded conductors. Should a fault occur from an ungrounded
conductor
to a grounded (neutral) conductor, the grounded (neutral) conductor
could be damaged before the overcurrent protection device opens if it
isn't sized to carry the available fault current.
What the Code says: The feeder
grounded
(neutral) conductor must not be sized smaller than specified in 250.122
for the equipment grounding (bonding) conductor, based on the rating of
the feeder protection device. (Text new to the Code is
underlined.)
Behind the change: Circuit conductors must have sufficient
ampacity, after ampacity adjustment, to carry the load, and they must
be
protected against overcurrent in accordance with their ampacity [215.3
and 240.4].
ADVERTISEMENT
The
Fluke T5 Electrical Testers allow you to troubleshoot faster and safer
than traditional solenoid testers. They let you check voltage,
continuity and current with one compact tool. With the T5, all you have
to do is select volts, ohms, or current and the tester does the rest.
OpenJaw™ current lets you check current up to 100A - without
breaking the circuit.
http://us.fluke.com/usen/products/Fluke++T5.htm?catalog_name=FlukeUnitedStates
Nightmare Installations
Do-It-Yourself Disaster
One day I was sent to a house to troubleshoot some
receptacles in the basement that weren't working. Upon opening the
first
one, I was amazed to see what looked like wire lamp cords crumbling in
my hands. As I opened other j-boxes, I discovered that someone had
wired the entire basement in #18 wire lamp cord, and due to the
overload
condition, it was brittle and crumbling apart. It was a miracle that
the
place didn't burn to the ground, considering the fact that nothing was
on a GFCI and it was on a breaker known for its slow tripping nature.
When I asked the owner who had wired the basement, he reluctantly
admitted that he had. When I asked him why he chose this wire, he said,
"That's what they use on lamps, and that's all we were going to plug
into the receptacles."
Mark Grimes
Wichita, Kan.
Send your 200-word story to us and it may
appear in a future issue of CodeWatch. Authors of stories chosen will
receive $25.
ADVERTISEMENT
Cool Electronic Cabinets
Low cost Cabinet Coolers stop electronic control downtime due to heat,
dirt and moisture. UL Listed Cabinet Coolers produce 20 degree
Fahrenheit air from an ordinary supply of compressed air to cool
electrical controls. Thermostat control minimizes air usage. Maintains
the NEMA 4, 4X (stainless steel) and 12 rating of the enclosure. Web
site offers detailed information, downloadable drawings and PDF
literature.
www.exair.com
Code Challenge
What's Wrong Here?
By Joe Tedesco
How does this
installation violate the NEC?
Hint: This installation proves that bad things happen in
threes.
Code Q&A
By Mike Holt
Q. Can service drop conductors be supported by
trees?
See the answer.
Code Quiz
By Steven Owen
The load on the service grounded "neutral" conductor in
a newly designed commercial office building (208/120V 3-phase, 4-wire
system) is 475A. The loads being served are nonlinear. The ungrounded
service entrance conductors were sized based a calculated load of 775A
that took into account numerous 3-phase loads, such as air conditioning
and heating, that have no neutral load. What is the demand load, if
any,
on the grounded "neutral" conductor of this system?
- 775A, neutral has to be the same size as phase
conductors
- 392.5A, 70% demand on portion exceeding 200A
- 475A, no reduction permitted when serving nonlinear loads
- 406.25A, 75% demand on portion exceeding 200A
Visit EC&M's Web
site
for the answer and explanation.
ADVERTISEMENT
Are You Paying Too Much for Enclosed
Starters?
Cerus builds quality HVAC and industrial starters that boost your
profit. 5 year contactor warranty backs up our quality. Custom
starters, pump panels, drives and more. Get all the facts.....www.cerusind.com
or 1-800-962-3787 for a FREE catalog.
Faces of the Code
Jim
Duncan Member, Code-Making Panel 15
By the time he graduated from Clemson's electrical
engineering program and the Coast Guard's officer candidate school, Jim
Duncan had had enough of dry land. In the hopes of spending months at
sea and traveling to the North and South Poles, he packed up his things
in Baltimore and asked to be stationed on an icebreaker in the Pacific.
Instead, he received a desk assignment in Seattle at the Coast Guard's
facilities design and construction command -- far from the sea-faring
adventure he wanted.
But the disappointment he felt at not getting to travel the world
was
soon replaced by the satisfaction he took from seeing people move into
the buildings he was designing. Four years after moving to Seattle, he
left the Coast Guard and joined Sparling, then a small electrical
engineering firm of only 20 employees. He designed electrical systems
for military buildings, commercial high rises, and TV stations, but it
was his work on health-care facilities -- a market he actively pursued
on his way to becoming CEO -- that would shape much of his career and
introduce him to Code-Making Panel 17 (and later Panel 15 when article
assignments were shifted).
Duncan joined CMP-17 in 1989 and became a principal in 1993, and he
continued to contribute to the health-care industry through a variety
of
other outlets. Aside from helping to write the IEEE White Book --
Recommended Practice for Electrical Systems in Health Care Facilities,
he undertook an initiative to change the way emergency generators are
sized for hospitals. The Code was changed to size them based on
the real rather than connected loads. "I'm very proud of that," he
says.
"We're saving health care dollars while increasing emergency system
reliability because the generators are now tested close to their rated
capability."
More than 30 years after the Coast Guard temporarily denied him his
dreams of seeing the world, Duncan has since done it on his own,
traveling to places like New Zealand, India, and South Africa. Growing
Sparling to the $18 million-a-year company it is today, on the other
hand, took the contributions of many, including some from the
Code-making panels. "I really enjoy being able to pick up the phone and
call colleagues and friends to ask their opinion on a design issue," he
says of his fellow members. "They're an amazing resource."
Speak Out
A Place of Their Own
Art. 517 for health-care facilities had its own
dedicated Code-making panel until the 2005 Code cycle when it was
folded
into Panel 15 along with carnivals, motion picture studios, and
theaters. With life safety on the line, should the requirements for
hospitals and critical care facilities have their own panel? Visit www.ecmweb.com to tell us.

Inspectors, if you thought you got a lot of calls before, wait a couple
weeks. CodeWatch readers say they call on their local inspector more
than anyone else for clarification when they don't understand a Code
rule, and with the 2005 NEC only a few weeks old, it's only a matter of
time before the questions start to pop up.
And for those of you with neighbors who still have the holiday
spirit
or are just too lazy to take down their lights, Joseph Greco, a
licensed electrician in New Jersey, recently sent us another
suggestion
for getting the word out about Art. 590's limits on temporary holiday
lights that takes advantage of everyone's favorite favorite home
appliance: the TV. Visit EC&M's Web
site for his idea.
|
|
You are subscribed to this newsletter as <*email*>
For questions concerning delivery of this
newsletter, please contact our Customer Service Department at:
US Toll Free: (866) 505-7173
International: (402) 505-7173
or custserv@newsletter.primediabusiness.com
Primedia Business Magazines & Media
9800 Metcalf Avenue
Overland Park, KS 66212
Copyright 2005, PRIMEDIA. All rights reserved. This article is
protected
by United States copyright and other intellectual property laws and may
not be reproduced, rewritten, distributed, re-disseminated,
transmitted,
displayed, published or broadcast, directly or indirectly, in any
medium
without the prior written permission of Primedia Business Magazines &
Media Inc.
|
|