| CONTENTS
|
445.18 - Disconnecting Means
Hang Up and Try
Again
What's
Wrong
Here?
Code Q&A
Code Quiz
Potential
Problems
Grounding vs Bonding Seminar
|
|
About this Newsletter
|
This twice-a-month e-newsletter is brought to you from the
publisher of EC&M magazine. CodeWatch will:
Let you know what could be changing in the Code®.
Help you brush up on your ability to apply the Code®.
Test your knowledge of the Code® with a Q&A format.
Introduce you to the people who vote on the rule changes.
Provide information on upcoming Code® seminars and shows.
Give you an opportunity to sound off on Code®-related issues.
We want to make sure we're providing you with the content you need to
better manage your business or enhance your technical skills. E-mail us and
let us know what you want to see in future issues of this e-newsletter.
We will do our best to address your request in a future issue of
CodeWatch.
|
Subscriptions
|
|
To sign up
for your free subscription, click here: Subscribe
To unsubscribe from this newsletter click here: Unsubscribe
To get this newsletter in a different format (Text, AOL or HTML),
or to change your e-mail address, please visit your profile page to change your delivery
preferences.
|
Back Issues
|
|
Missed an
issue? Visit the
CodeWatch archive on EC&M's Web site.
|
Tell a friend about CodeWatch
|
|
Do you know
of someone who'd like to receive CodeWatch? Visit the subscriber site, enter their e-mail
address and spread the wealth!
|
Advertising
|
To find out
how to advertise in this newsletter, e-mail David Miller or call
him
at (312) 840-8497.
The designations "National Electrical Code” and “NEC” refer to the
National Electrical Code®, which is a registered trademark of the
National Fire Protection Association.
ADVERTISEMENT

ADVERTISEMENT

|
| | | | |
|
Top 2005 Code Changes
445.18 -
Disconnecting Means
By Mike Holt
A change to this section permits a single generator to
have multiple disconnecting means to allow flexibility and to provide a
safer environment when maintenance is necessary. (Note: Code
text
has been paraphrased.)
What the Code says: Generators must
have one or more disconnecting means that disconnects all power,
except where:
(1) The driving means for the generator can be readily shut down,
and
(2) The generator isn't arranged to operate in parallel with
another
generator or other source of voltage. (Text new to the Code is
underlined.)
Behind the change: This rule is necessary because a single
generator can be used to supply emergency, legally required, as well as
optional standby power through different transfer switches. Be careful
--
if one generator is used to supply emergency, legally required, as well
as optional standby power, then there must be at least two transfer
switches: one for emergency power and another for legally required as
well as optional stand-by power [700.6(D)].
ADVERTISEMENT
Two Powerful Tools in One: The Fluke 1587 and
1577
Insulation Multimeters combine a digital insulation tester with a
full-featured, true-rms digital multimeter in a single compact,
handheld
unit.
www.fluke.com
Nightmare Installations
Hang Up and Try Again
A few years ago, while upgrading a 100A service panel
located in a residential garage, I noticed what appeared to be two
black
TW or THW wires about the size of 8 AWG entering the panel without
conduit (a not-uncommon practice of do-it-yourselfers). As I removed
the
incoming wires for the replacement, I found that what I thought were
THW
wires were actually two very old 2-pair phone cables. The four 20 AWG
phone wires in each had been twisted together and connected to a
2-pole,
30A breaker, which fed a garage. Why there had never been a fire, I
have
no idea. The only load on the circuit was a yard light, but there was
evidence that there had been other lights and receptacles connected at
one time. Needless to say, all was replaced.
Roger Roossinck
Sparta, Mich.
Send your 200-word story to us and it may
appear in a future issue of CodeWatch. Authors of stories chosen will
receive $25.
ADVERTISEMENT
Cool Electronic Cabinets
Stop electronic control downtime due to heat, dirt and moisture. UL
Listed Cabinet Coolers produce 20 degree Fahrenheit air from an
ordinary
supply of compressed air to cool electrical controls. Thermostat
control
minimizes air usage. Maintains the NEMA 4, 4X (stainless steel) and 12
rating of the enclosure. Web site offers detailed information,
downloadable drawings and PDF literature.
www.exair.com/15/540_08a.htm
Code Challenge
What's Wrong Here?
By Joe Tedesco
Got a guess for how this installation violates the NEC?
Visit EC&M's
Web site to see the answer.
Hint: Recycling isn't always a good thing.
Code Q&A
By Mike Holt
Q. What size grounding electrode conductor is
required for a 1,200A service supplied with three sets of 600 kcmil
conductors per phase?
Visit EC&M's Web
site to see the answer.
Code Quiz
By Steven Owen
What's the minimum size THHN insulated conductor
required for the power conversion equipment included as part of an
adjustable speed drive system that uses a bypass device. The rated
input
of the power conversion equipment is 36A. The motor is rated 30 hp,
480VAC, 3-phase. The terminals at the power conversion equipment are
rated 75°C.
- 10 AWG THHN
- 8 AWG THHN
- 6 AWG THHN
- 4 AWG THHN
Visit EC&M's Web
site
for the answer and explanation.
ADVERTISEMENT
www.NECcode.com
The National Electrical Code Internet Connection, the No. 1
rated Code Web site in the world, offers the following FREE products:
Books, Code Quiz, DVDs, Graphics for PowerPoint, Newsletter, Online
Training, Posters, Simulated Exams, Software, Video clips, and Videos
Visit www.NECcode.com and stay
current with important industry issues.
Speak Out
Potential Problems
As Nightmare Installations shows, there's no shortage
of
shoddy electrical work. How often do you run across installations with
Code violations when you perform service and maintenance work? Visit EC&M's Web site to tell us.
"Get on with it!" That's what CodeWatch readers are saying about
Code-making panels' approach to adding GFCI requirements to the NEC.
Although less than one-third said the Code has adequately addressed the
need for GFCIs, 40% said it was time to apply an across-the-board
requirement for
all receptacles.
Shows and Events
Grounding vs
Bonding Seminar
Grounding and bonding of electrical systems, sensitive
electronic, and communications equipment is the most important and
least
understood activity in the electrical, data processing, and
communications industry. At four two-day seminars, Code expert Mike
Holt
will explain the basics as well as the advance concepts necessary to
understand the practical grounding and bonding rules in the NEC for
systems not over 600V. Download
the conference brochure for specific dates and locations.
|
|
You are subscribed to this newsletter as <*email*>
For questions concerning delivery of this
newsletter, please contact our Customer Service Department at:
US Toll Free: (866) 505-7173
International: (402) 505-7173
or custserv@newsletter.primediabusiness.com
Primedia Business Magazines & Media
9800 Metcalf Avenue
Overland Park, KS 66212
Copyright 2005, PRIMEDIA. All rights reserved. This article is
protected
by United States copyright and other intellectual property laws and may
not be reproduced, rewritten, distributed, re-disseminated,
transmitted,
displayed, published or broadcast, directly or indirectly, in any
medium
without the prior written permission of Primedia Business Magazines &
Media Inc.
|
|