| CONTENTS
|
Two New NEC Adoptions
What's
Wrong
Here?
Code Q&A
Code Quiz
Understanding and Applying the 2005
NEC
NEC Sessions Scheduled
for 2006 NFPA World Safety Conference & Exposition
|
|
About this Newsletter
|
This twice-a-month e-newsletter is brought to you from the
publisher of EC&M magazine. CodeWatch will:
Let you know what could be changing in the Code®.
Help you brush up on your ability to apply the
Code®.
Test your knowledge of the Code® with a Q&A format.
Introduce you to the people who vote on the rule changes.
Provide information on upcoming Code® seminars and
shows.
Give you an opportunity to sound off on
Code®-related issues.
We want to make sure we're providing you with the content you need to
better manage your business or enhance your technical skills. E-mail us and let us
know what you want to see in future issues of this e-newsletter. We
will
do our best to address your request in a future issue of CodeWatch.
|
Subscriptions
|
|
To sign up
for your free subscription, click here: Subscribe
To unsubscribe from this newsletter click here: Unsubscribe
To get this newsletter in a different format (Text, AOL or HTML),
or to change your e-mail address, please visit your profile page to change your delivery
preferences.
|
Back Issues
|
|
Missed an
issue? Visit the
CodeWatch archive on EC&M's Web site.
|
Tell a friend about CodeWatch
|
|
Do you know
of someone who'd like to receive CodeWatch? Visit the subscriber site, enter their e-mail
address and spread the wealth!
|
Advertising
|
To find out
how to advertise in this newsletter, e-mail David Miller or call him at
(312) 840-8497.
The designations "National Electrical Code” and “NEC” refer to the
National Electrical Code®, which is a registered
trademark of the
National Fire Protection Association.
ADVERTISEMENT

|
| | | | |
|
Code News Update
Two New NEC Adoptions
The city of Dallas and the state of Georgia recently
adopted the 2005 National Electrical Code as their basic wiring
standard with amendments.
The city of Dallas amendments, which were recommended by the North
Central
Texas Council of Governments, include:
- a new exception to 230.71(A), which allows for more than six
disconnects to be grouped at one location.
- a new exception to 300.11, which provides limited support of
raceways and cables by ceiling grid support wire.
- a change to 310.15(B)(6), which (according to the council) provides
a more reasonable margin of safety for dwelling service and feeder
conductor allowable ampacities.
- a change to 500.8(A)(1), which eliminates some text deemed
redundant
with the definition of "identified" in Chapter 1.
The state of Georgia amendments, which were recommended by the
Georgia
State
Codes Advisory Committee, include:
- a change to 210.8(B), which requires GFCI protection for
receptacles
located within 6 feet of a sink or basin, excluding those listed in
Section 517.21.
- a change in the wording of 210.12(B).
Both adoptions had an effective date of January 1, 2006.
ADVERTISEMENT
Achieve Your Performance Goals
Anticipate, prevent and troubleshoot motors, electrical and equipment
maintenance with fast, accurate non-contact temperature measurements
with Fluke infrared thermometers. www.fluke.com/codewatch_temp
Code Challenge
What's Wrong Here?
By Joe Tedesco
Think you know how this installation violates the NEC?
Visit EC&M's
Web site to see the answer.
Hint: Use your nose to help sniff out this violation.
Code Q&A
By Mike Holt
Q. Is it good practice to bond the lightning
protection system to the building grounding electrode system?
Visit EC&M's
Web site to see the answer.
Code Quiz
By Steven Owen
Q. With respect to a solar photovoltaic system,
a
disconnecting means is required to disconnect all current-carrying
conductors of a photovoltaic power source from all other conductors in
a
building or other structure. A switch or circuit breaker shall not be
installed in a grounded conductor unless ___________. Is a bolted or
terminal disconnecting means (lug) acceptable as a disconnecting means
for the grounded conductor?
A) you decide it's okay / No
B) allowed by special permission of the Authority Having
Jurisdiction / No
C) the switch or circuit breaker is part of a ground-fault
detection system required by 690.5 -- and that switch or circuit
breaker is automatically opened and indicated as a normal function of
the device in responding to ground faults / Yes
D) all conductors, including the grounded conductor, are
simultaneously opened by a circuit breaker / No
Visit EC&M's
Web site for the answer and explanation.
ADVERTISEMENT
Cool Electronic Cabinets
Low cost Cabinet Coolers stop electronic control downtime due to heat,
dirt and moisture. UL Listed Cabinet Coolers produce 20 degree
Fahrenheit air from an ordinary supply of compressed air to cool
electrical controls. Thermostat control minimizes air usage. Maintains
the NEMA 4, 4X (stainless steel) and 12 rating of the enclosure. Web
site offers detailed information, downloadable drawings and PDF
literature.
www.exair.com/15/540_12b.htm
Education and Training
Understanding and
Applying the 2005 NEC
The Electric West Exposition & Conference, March 1-3,
2006 at the Las Vegas Convention Center, will be offering over 50
conference courses and professional advancement courses on a wide
variety of electrical topics. Session NEC01, Understanding and
Applying the 2005 NEC, will be taught by noted NEC expert and
EC&M Code consultant Mike Holt of Mike Holt Enterprises, Inc.
This course will help you understand the concepts necessary to design,
install, inspect, measure, and troubleshoot electrical systems, as well
clear up confusing and seemingly conflicting or controversial NEC
rules.
CEU credits are available upon successful completion of this course.
For
more information and to register visit www.electricshow.com.
ADVERTISEMENT
Connected & Protected
IDEAL's new WeatherProof Wire Connectors are the fastest,
easiest and safest way to connect wires in damp or wet locations.
Pre-filled with a silicone-based sealant and UL listed to 486D, these
connectors protect conductors from moisture, humidity and other
corrosive elements. Visit www.idealindustries.com to
request a free sample.
Shows and Events
NEC Sessions Scheduled for 2006 NFPA
World
Safety Conference & Exposition
The 12 sessions that make up the necforum are
designed
to help you consider new electrical design issues, analyze maintenance
programs, review best practices in the electrical contracting arena,
learn effective inspection techniques, and implement practical safety
programs. If these topics interest you then make plans to fly to
Orlando
in early June and take part in this year's event, which will be held
from June 2-8, 2006. Visit the NFPA
World Safety Web site for additional details.
ADVERTISEMENT
www.NECcode.com
The National Electrical Code Internet Connection, the No. 1
rated Code Web site in the world, offers the following FREE products:
Books, Code Quiz, DVDs, Graphics for PowerPoint, Newsletter, Online
Training, Posters, Simulated Exams, Software, Video clips, and
Videos. Visit www.NECcode.com and
stay
current with important industry issues.
|
|
You are subscribed to this newsletter as <*email*>
For questions concerning delivery of this
newsletter, please contact our Customer Service Department at:
US Toll Free: (866) 505-7173
International: (402) 505-7173
or custserv@newsletter.prismb2b.com
Prism Business Media
9800 Metcalf Avenue
Overland Park, KS 66212
Copyright 2006, Prism Business Media. All rights reserved. This article
is protected
by United States copyright and other intellectual property laws and may
not be reproduced, rewritten, distributed, re-disseminated,
transmitted,
displayed, published or broadcast, directly or indirectly, in any
medium
without the prior written permission of Prism Business Media.
|
|