CONTENTS
|
Reports 101
Motor Maintenance Tip, Part
8
Electrical Troubleshooting
Quiz
Facilitate Breaker Repairs
Make Space
NEC in the Facility
Safety
Answer to Electrical
Troubleshooting Quiz
|
|
About This Newsletter
|
This twice-a-month e-newsletter is brought to you from the
publisher of EC&M magazine. MRO Insider addresses topics such
as:
Working with management and supervision
National Electrical Code® on the production floor
Safety procedures and programs
Troubleshooting techniques
Equipment maintenance and testing tips
Managing motors and generators
Trends in training and education
Managing energy use
|
Subscriptions
|
|
To unsubscribe from this newsletter go to: Unsubscribe
To subscribe to this newsletter, go to: Subscribe
To get this newsletter in a different format (Text or HTML),
or to change your e-mail address, please visit your profile
page to change your delivery preferences.
|
Back Issues
|
|
Missed an
issue? Visit the MRO
Insider archive page on the EC&M Web site.
|
Share with a Friend
|
|
Do you know
someone who?d like to receive his or her own copy of MRO Insider? Visit
the subscriber site enter their e-mail address, and spread the wealth.
Subscribe
|
Advertising
|
To find out
how to advertise in this newsletter, e-mail David Miller or call him at
(312) 840-8487.
The designations "National Electrical Code" and "NEC"
refer to the
National Electrical Code®, which is a registered
trademark of the National Fire Protection Association.
ADVERTISEMENT


|
| | | | |
|
Maintenance
Reports 101
You can use maintenance reports to see where you should
improve your maintenance efforts and to defend or expand the budget
needed to implement those improvements.
But the reports are only as good as the data on which you base them,
so you need efficient ways of collecting accurate data. To reduce the
overhead of manual collection methods, talk to vendors about automated
data collection through your control systems and power monitoring
system.
For manual collection:
- Collect only the data you need. Ask for too much, and
accuracy plummets. Don't ask for data that would be "nice to
have."
- Use simple collection forms. Provide predetermined choices,
wherever possible, ensuring the choices include "other."
- Motivate the data collectors
. Techs under pressure to
do
repairs (or PM) with equipment shut down need frequent reminders that
recording data serves a vital purpose. When you can show a connection
between results and data collection, do so.
In our next issue, we'll look at what information you need to make
those
reports especially effective.
Motor Maintenance
Tip, Part 8
About half of all motor failures occur due to failed
bearings. One cause of bearing failure is the mixing of incompatible
greases, which can have the same effect as pouring sand into the
bearing. Determine which lubricant to use in a given bearing, and stick
with it.
Another cause is excessive greasing. Excess grease can:
- Hold in heat to the point that all of the grease melts and runs
out,
leaving the bearing dry.
- Create a hard crust that abrades the bearing.
- Short your windings.
Misalignment, poor mounting, and overloading also cause bearing
failures. Don't add to those problems with improper lubrication
methods.
ADVERTISEMENT
The
NEW Fluke 568 IR and contact thermometer
With a straight-forward user interface and soft-key menus, the Fluke
568
makes even complex measurements easy. Quickly navigate and adjust
emissivity, start data logging, or turn on and off alarms, with just a
few pushes of a button. A rugged, ergonomic design means the 568 can
stand up to tough industrial, electrical, and mechanical
environments.
Repair
Electrical
Troubleshooting Quiz
Your boss temporarily reassigns you to another facility
to solve its plant-wide plague of premature motor failures. You've
already reviewed the information from the power monitoring system and
ruled
out voltage imbalance and other supply issues. You want to solve this
problem quickly and go home. Where should you focus your efforts?
The answer to this question appears at the end of this
newsletter.
Facilitate Breaker
Repairs
Previously, we identified some information needed for
each model of breaker. However, you also need certain information on
each individual breaker. Ideally, you will store this in your
CMMS and ensure it's easily accessible to the repair techs.
For each breaker, have information such as:
- Load data. Characterize each load. Include current draw,
inrush currents, usage factors, and any data pertinent to that
application.
- Settings. Determine the correct values for each possible
adjustment. This typically shouldn't (or can't) be done in the
field.
- PM data trends. Comparing test measurements to historic
trends can greatly reduce repair time while increasing the completeness
of repairs.
- Maintenance history. What has been done (or not done) to
maintain that breaker? What anomalies have been noted?
Additional tips include:
- Review breaker information for completeness and accuracy, as part
of
the scheduled PM.
- Store test results digitally so they can be easily accessed and
easily trended.
- Store thermal image files digitally, to speed up retrieval and
comparison.
Make Space
Senior managers seek to maximize revenue per square
foot
of floor space. So when Article 110 and OSHA 1926.403 talk about
minimum
working clearances, all of the values somehow get translated into
exactly 3 feet of working clearance.
Make a point of correcting this "lost-in-translation" problem, but
don't
stop there. Art. 110 and OSHA 1926.403 provide several values of
minimum clearances for safety. The clearances needed to maximize
the average revenue per square foot of the facility could be
significantly more.
If a production line produces $250,000 an hour of revenue, what's
the
net loss resulting from the "fully utilized" floor space arrangement
that doubles the time needed for repair?
Walk through your critical repair situations and look for a
combination
of permanent space, temporary space, modified accessways, modified
tools, and innovative techniques that can eliminate delays caused by
trying to work in too-tight quarters.
ADVERTISEMENT
May 5 - 7, 2008
Battcon International Stationary Battery Conference,
Marco Island, Florida.
This user-oriented conference on the applications and issues of storage
battery power systems draws users, battery and equipment manufacturers,
installers, R&D, and safety experts from power and telephone companies
and UPS manufacturers. Includes technical presentations, panels, and
trade show.
Jennifer Stryker, Albércorp/Battcon, 3103 No. Andrews Ave. Ext.,
Pompano Beach, FL 33064. (954) 623-6660. www.battcon.com.
Operation
NEC in the
Facility
Feeder taps seem to grow in popularity as a facility
ages. The reasons for using feeder taps in new construction tend to
focus on installation cost. In an existing facility, the focus
tends to be on installation speed. Take care not to go too fast.
You can't install all feeder taps per 240.21(B). If such a tap supplies
a motor, it must comply with 430.28.
Safety
Report all unsafe conditions to your supervisor (even
if
you are a supervisor). Depending on the circumstances, you may report
unsafe conditions to other people first.
For example, say you notice a gas leak. Your first duty is to "sound
the alarm" and warn others so they can leave the area. Then, you need
to
ensure the first responders are notified. After you've addressed the
immediate situation this way, you then notify the area manager (e.g.,
the production manager or line supervisor for the affected area). Now,
at last, you can tell your supervisor.
ADVERTISEMENT
Space-saving pull box ships and stores flat
The EZ FORM Pull Box by Hoffman stores flat and out of the way in
trucks or cribs, folding and snapping together in seconds when you're
short a pull box. Save time spent on trips to retrieve an additional
pull box request a
free sample today.
Quiz Answer
Answer to
Electrical Troubleshooting Quiz
The fact this is a plant-wide issue actually helps you
narrow down the problem. Application-specific motor selection issues,
such as the wrong insulation rating for the temperature, are unlikely
to
be at the root of a plant-wide problem. Apply this same "filter" to
other potential causes and most will move to the "unlikely" column.
The root cause will likely be human error. But what error is it?
Conduct a forensic analysis of a few failed motors, and symptoms that
are common to these will lead to the answer.
The new maintenance manager at an appliance plant found his answer
after opening a few motors. Each one was filled with grease -- packed
in
tight. At this plant, motor lubrication had been regarded as "grunt
work" and assigned to two junior techs working a backshift.
Several manufacturers' maintenance manuals clearly explained the
motor lubrication procedure. However, nobody read the manuals. The
techs
were pumping in random
amounts
of new grease without opening the bottom port to remove the old grease.
|
You are subscribed to this newsletter as #email#
For questions concerning delivery of this newsletter, please contact
our
Customer Service Department at:
Customer Service Department EC&M
A Penton Media publication
US Toll Free: 866-505-7173
International: 847-763-9504
Email:ecmweb@pbinews.com
Penton Media | 249 W. 17th Street | New York, NY 10011
Copyright 2008, Penton Media, Inc. All rights reserved. This article is
protected by United States copyright and other intellectual property
laws and may not be reproduced, rewritten, distributed,
re-disseminated,
transmitted,
displayed, published or broadcast, directly or indirectly, in any
medium
without the prior written permission of Penton Media, Inc.
|
|