|
CONTENTS
|
You and CMMS, Part 6
Electrical Troubleshooting
Quiz
Some Repairs Matter More Than
Others, Part 3
NEC in the Facility
Safety
Code Change Conferences Are
Coming
ADVERTISEMENT


|
|
About This Newsletter
|
This twice-a-month e-newsletter is brought to you from the
publisher of EC&M magazine. MRO Insider addresses topics such
as:
Working with management and supervision
National Electrical Code® on the production floor
Safety procedures and programs
Troubleshooting techniques
Equipment maintenance and testing tips
Managing motors and generators
Trends in training and education
Managing energy use
|
Subscriptions
|
|
To unsubscribe from this newsletter go to: Unsubscribe
To subscribe to this newsletter, go to: Subscribe
To get this newsletter in a different format (Text or HTML),
or to change your e-mail address, please visit your profile
page to change your delivery preferences.
|
Back Issues
|
|
Missed an
issue? Visit the MRO
Insider archive page on the EC&M> Web site.
|
Share with a Friend
|
|
Do you know
someone who'd like to receive his or her own copy of MRO Insider? Visit
the subscriber site enter their e-mail address, and spread the wealth.
Subscribe
|
Advertising
|
To find out
how to advertise in this newsletter, e-mail David Miller or call him at
(312) 840-8487.
The designations "National Electrical Code" and "NEC" refer to the
National Electrical Code®, which is a registered
trademark of the National Fire Protection Association.
ADVERTISEMENT


ADVERTISEMENT

|
| | | | |
|
Maintenance
You and CMMS, Part
6
Nearly everyone with a computerized maintenance
management system (CMMS) uses it to schedule and track maintenance —
and nearly everyone underutilizes it. The early CMMS products put paper
PM processes into electronic format, but today’s CMMS can do far
more.
Two examples include:
- Analyze task relationships. Tasks may be related in some way
whereby scheduling them together saves time and money. Consider timing
(e.g., available downtime), required skill set, and involvement of
contractors.
- Compare maintenance data trends to maintenance intervals. If
a motor's alignment is consistently well within tolerance, why check it
every quarter?
Dig into your CMMS to see what tools it has for optimizing your
maintenance scheduling.
ADVERTISEMENT
Based on you. Built by Fluke. The scars and sweat
of
pros like you are the inspiration for every innovation put into Fluke
tools. Nothing wasted. Nothing unnecessary. Just the perfect tool
built to help you work faster, safer and smarter. In the real
world. See the inspirations you’ve inspired www.fluke.com/GetReal
Repair
Electrical
Troubleshooting Quiz
A month ago, one of three major production lines
started
shaking. The problem has gotten worse, and now your boss wants you to
solve this problem. You look in the CMMS and find that the main drive
motor has been aligned three times. There was no "as found" or "as
left"
alignment or vibration data, just an entry stating it was aligned.
How can you efficiently solve this?
Visit EC&M's website
to see the answer.
Some Repairs Matter
More Than Others, Part 3
Equipment that makes the most money per hour and/or has
the tightest delivery schedule usually must be fixed under
pressure-cooker conditions. How is your record on this?
If you look in the repair logs, do you see shorter repair times for
the same types of repairs as you go from earlier repairs to more recent
ones? Why or why not?
Urgency sometimes leads to counterproductive decisions. The
palletizer is down, so the first available tech is sent there. However,
that tech hasn't done a repair on this equipment before and isn't even
familiar with it. After lots of head scratching and research, all of
which have been done by somebody else on previous repairs, the tech
begins actual troubleshooting.
To read more on this story, visit EC&M's website.
ADVERTISEMENT
New Surge-Trap® STX Series Mersen
(formerly Ferraz Shawmut) introduces its new line of UL 1449 third
edition approved surge protection devices (SPDs), the Surge-Trap
Type 1 X-Series. The STX series provides overvoltage protection for
all locations in the facility with the smallest footprints available.
It
features industry leading TPMOV technology inside.
Operation
NEC in the
Facility
In the previous issue of this newsletter, we looked at
some electrical inspection rules covered in 80.13 (in Annex H). Also in
80.13, we find that the authority having jurisdiction (AHJ) has the
authority to conduct investigations of electrical fires, explosions, or
other hazardous conditions [80.13(11)]. This is one of the five major
functions identified in 80.1.
But who determines who the AHJ is? "The governing body" does
[80.13].
Just who is this "governing body?" It's the "electrical board," and we
find the requirements for it in 80.15.
Each state determines which standard to adopt as its electrical
regulations. This may be the current NEC. In some cases, it's the
previous edition of the NEC with the state's amendments.
To read more on this story, visit EC&M's website.
Safety
In recent years, you've probably heard about NFPA 70E
far more often than you previously did. But it's no simple document.
Here are three key concepts to understand so you can properly apply
NFPA
70E:
- Understand that OSHA's position has always been to de-energize
equipment before any work is performed on it.
- Don't ask, "What can I get by with?" and try to finesse the
requirements. Instead, ask, "How can I protect myself from arc blast
and
arc flash while servicing this equipment?"
- Use the arc flash label (required by the NEC 110.16) as a point of
reference, not as an authoritative determination of whether arc flash
hazards exist and to what degree. Note that absence of a label does not
mean absence of arc flash danger.
ADVERTISEMENT
Crimp Terminals With over 1,000 types of terminals
in stock, we know we have the wiring solution for you. ElecDirect.com
makes it easy to shop online, compare prices and get your product fast!
Click to view our huge selection of wire terminals in PVC, Nylon, High
Temperature and Heat Shrinkable styles. www.elecDirect.com/terminals
Show & Events
Code Change
Conferences Are Coming
The 2011 NEC is coming. Will you be ready for the
changes? By attending one of EC&M's Code Change Conferences,
presented by NEC expert Mike Holt and sponsored by EC&M University, you'll
learn everything you need to know about major NEC changes that will
impact your work, whether you're an electrician, electrical engineer,
electrical designer, plant/facility electrical maintenance person, or
electrical inspector. Check out the following conferences for a
location
and time that's right for you.
- Philadelphia November 29-30, Hilton Philadelphia City
Avenue
- Boston December 7-8, Venue to be determined
- Orlando December 13-14, Hyatt Regency Orlando
Airport
If you're a registered professional engineer and attend one of the
2011 NEC Code Change Conferences, you'll be granted professional
development hours (PDHs), a requirement for re-licensing. The program
is
also certified as an approved provider of Code Update training by those
states requiring continuing education hours for re-licensing of
journeymen, master electricians, and electrical contractors.
Register now to
attend one of the these events. For more details on the conferences and
a full program, visit EC&M's website.
|
You are subscribed to this newsletter as #email#
For questions concerning delivery of this newsletter, please contact
our
Customer Service Department at:
Customer Service Department EC&M
A Penton Media publication
US Toll Free: 866-505-7173
International: 847-763-9504
Email:ecmweb@pbinews.com
Penton Media | 249 W. 17th Street | New York, NY 10011
Copyright 2010, Penton Media, Inc. All rights reserved. This article is
protected by United States copyright and other intellectual property
laws and may not be reproduced, rewritten, distributed,
re-disseminated,
transmitted,
displayed, published or broadcast, directly or indirectly, in any
medium
without the prior written permission of Penton Media, Inc.
|
|