View this email as a Web page Please add TDW_Energizing_ to your Safe Sender list.
 From Transmission & Distribution World | A Penton Media Publication |  November 4, 2009 Vol. 8, No. 44 
ADVERTISEMENT


SEL-351 Protection System Simplifies Automation and Control With IEC 61850

The industry standard SEL-351 Protection System just got better. The new SEL-351 has everything you expect, including IEC 61850 protocols. Apply IEC 61850 to integrate substation automation and control systems. For more information about all the protection, communication, and control you need for your distribution system, visit www.selinc.com/11e.



Table Of Contents

Transmission, Renewables Integration Top List of Issues in Ten-Year Electric Reliability Outlook
J.D. Power Releases UK Customer Satisfaction Study
NV Energy and WAPA Sign MOU. to Study Nevada to California/Southwest Transmission Projects
Nation's Chains Recognize Outstanding Electric Company Customer Service
Smart Meter Installations to Reach 250 Million Worldwide by 2015, Says Pike Research
Allegheny Power Invests Over $150 Million in West Virginia for Reliability Improvement Projects
EER Expects 8+ GW by Year-End 2009 in U.S. Wind Market
EMC Linemen in Georgia Climb to the Top in International Competition
Nine Federal Agencies Enter into a Memorandum of Understanding
Electric Cooperatives Receive Over $215 Million for Smart Grid Investments
Big Cats in the Mountains
Technology Advances Vegetation Management
Calendar of Events
Job Opportunities
Building a Smarter Grid: Managing Assets to Improve Utility Decision Making
Crisis Management: How to Beat the Odds And Come Out a Hero

ADVERTISEMENT

Space-Time Insight’s geospatial situational awareness and remediation composite applications automatically integrate and correlate functionality and data from all the systems you already use, delivering: comprehensive, context-, location-, and condition-based visual analytics on 3D satellite images for fast, informed decisions; links that launch remediation from the same screen; automated compliance reporting; and full-context historical replay. www.spacetimeinsight.com






News Flash

Transmission, Renewables Integration Top List of Issues in Ten-Year Electric Reliability Outlook
Key issues such as transmission siting, cyber security, integration of renewables, climate policy, and the smart grid will require changes to policy, planning, and operations over the next 10 years, announced the North American Electric Reliability Corp. in its 2009 Long-Term Reliability Assessment.

J.D. Power Releases UK Customer Satisfaction Study
With customer-reported electricity and gas rates reaching historically high levels in the UK, proactive communication to customers about price changes and managing their energy costs is particularly important to overall customer satisfaction with utility suppliers, according to the J.D. Power and Associates 2009 UK Electricity and Gas Supplier Customer Satisfaction Study.

NV Energy and WAPA Sign MOU. to Study Nevada to California/Southwest Transmission Projects
NV Energy, Inc. and the Western Area Power Administration have signed a Memorandum of Understanding to explore the potential development of 500-kV transmission lines and associated facilities to access renewable energy resources and deliver those resources to electricity users in Nevada, California, Arizona and other markets in the Southwest United States.

Nation's Chains Recognize Outstanding Electric Company Customer Service
The nation’s leading chain and multi-site businesses have named the winners of Edison Electric Institute’s 2009 National Key Accounts Customer Service Awards program.

Smart Meter Installations to Reach 250 Million Worldwide by 2015, Says Pike Research
According to a new report from Pike Research, more than 250 million smart meters will be installed worldwide by 2015, representing a penetration rate of 18% of all electrical meters by that time, up from 46 million in 2008.

Allegheny Power Invests Over $150 Million in West Virginia for Reliability Improvement Projects
Allegheny Power has completed $156 million in infrastructure improvements and new construction in West Virginia over the past two years.

EER Expects 8+ GW by Year-End 2009 in U.S. Wind Market
The U.S. wind energy market could reach 8 GW installed in 2009, (including project spill-over from 2008 and new wind build), despite initial fears of a major drop in megawatts resulting from the financial crisis.

EMC Linemen in Georgia Climb to the Top in International Competition
Electric cooperatives in Georgia ranked among the top 10 in the nation during the 26th Annual International Lineman's Rodeo held Oct. 17 in Bonner Springs, Kansas.

Nine Federal Agencies Enter into a Memorandum of Understanding
Nine federal departments and agencies have signed a Memorandum of Understanding (MOU) to make it faster and simpler to build transmission lines on Federal lands.

Electric Cooperatives Receive Over $215 Million for Smart Grid Investments
President Obama this week announced $3.4 billion in grant awards to utilities seeking to invest in the deployment of smart grid infrastructure. Of this total, $215,558,896 will go to more than 50 electric cooperatives and public power districts in 14 states.


ADVERTISEMENT

Dow Inside is a new initiative from Dow Wire & Cable that benefits utilities, municipalities and electrical co-ops by working together with select cable manufacturers to provide power cables made with Dow materials under the highest standards to provide an assurance of longevity and reliability at the lowest lifetime system cost. Click Here



In-Depth

Big Cats in the Mountains
T&D World
Amazing transmission line construction and reconstruction challenges are conquered with skill, good judgment, imagination and teamwork...

Technology Advances Vegetation Management
T&D World
Software solutions significantly advance Progress Energy's transmission right-of-way management processes...


ADVERTISEMENT

The TESLA 4000 Multi-timeframe Power System Recorder exceeds NERC disturbance monitoring and reporting requirements. It combines an advanced phasor measurement unit (PMU), continuous disturbance recording (CDR) and IEC 61850 station bus protocol, with powerful and intuitive analysis software. The ERLPhase family of multi-function relays and recorders provide smart solutions to your protection, monitoring and control needs. www.erlphase.com



Conferences and Conventions

Calendar of Events
T&D World's complete 2009 event calendar can be found at: 2009 Calendar of Industry Events.

Nov. 8-12: Electrical Transmission and Substation Structures Conference, Ft. Worth, Texas, U.S., (800) 548-2723, www.asce.org/conferences

Nov. 15-17: Illuminating Engineering Society of North America Annual Conference, Seattle, Washington, U.S., (212) 248-5000, www.iesna.org


ADVERTISEMENT

Sabre Tubular Structures, the steel pole division of Sabre Industries, Inc., designs and manufactures tubular steel poles used in power transmission & distribution, substations, and communication applications. Located in Alvarado, Texas, our state of the art facility includes nearly 200,000 square feet of production space situated on approximately 150 acres. www.sabretubularstructures.com/



Careers in T&D

Job Opportunities
To post your job opening in Energizing and on the T&D World website or magazine, call 484-478-0154 or e-mail: susan.schaefer@penton.com. Visit Jobzone to view additional career opportunities.

Managing Engineer
Colorado Springs, CO

This position resides in the energy construction, operations and maintenance department of Colorado Springs Utilities...

Transmission Engineer
Houston, TX

Dashiell is currently seeking a Transmission Engineer for our Houston, TX office....

Principal Transmission Engineer
Everett, WA

Snohomish PUD is seeking an Engineer to plan, organize and coordinate technical aspects of District transmission and distribution projects consistent with the District's mission, goals, and values...

Sr. Manager-Substation, Metering, Telecommunications Svs
Everett, WA

Directs the design, construction, and maintenance of substations, metering, apparatus, and telecommunication services...

Distribution Engineer
Wallingford, CT

The Town of Wallingford Electric Division is seeking a highly technical individual to work in the design and development of overhead and underground power distribution lines...

Principal Senior System Engineer
Warrendale, PA

As the Principal System Studies Engineer you will independently lead and perform power systems engineering studies and analysis in specific areas of electromagnetic transient phenomena...

Sr. System Studies Engineer
Warrendale, PA

As the Senior System Studies Engineer you will perform and lead power systems engineering studies and analysis...




ADVERTISEMENT

SCADA, Synchrophasor, IEC-61850: ReLab Software’s complete Smart Grid Solution and Substation Automation. Product Features: Rich Functionality; Highest Reliability; Easy to Use; Low Cost-of-Ownership; Fast Return-on-Investment. Designed for rapid project development and implementation, IEDs are configured in less than 10 minutes with no user training required, just load and go. Smart Grid and Substation Automation solutions for any size enterprise. Visit our website, www.relabsoft.com, to get more information and download a demo version TODAY!



Sponsored Content

Building a Smarter Grid: Managing Assets to Improve Utility Decision Making
This podcast, hosted by Greg Scheu, ABB Head of Power Products in North America, looks at managing the overall assets of the T&D operation, and examines the information required to operate/maintain those assets...

Crisis Management: How to Beat the Odds And Come Out a Hero
A crisis does not have to be a catastrophe. Threats abound: hurricanes, typhoons, wildfires, lightning strikes, extreme temperature, intense wind, floods, ice, local activism, terrorism...


ADVERTISEMENT


Reliability, quality and capacity. These critical issues drive today's power delivery market. If your system needs a boost to meet new demands and expectations, turn to the nation's leading T&D design firm, POWER Engineers. From system enhancements to new designs, we'll give you the power to perform. www.powereng.com

About this Newsletter

To get this newsletter in a different format (Text or HTML), or to change your e-mail address, please visit your profile page to change your delivery preferences.

For questions concerning delivery of this newsletter, please contact our Customer Service Department at:
Customer Service Department
Transmission Distribution World
A Penton Media publication
US Toll Free: 866-505-7173
International: 847-763-9504
Email:tdworld@pbinews.com

Penton Media | 249 W. 17th Street | New York, NY 10011

Copyright 2007, Penton Media. All rights reserved. This article is protected by United States copyright and other intellectual property laws and may not be reproduced, rewritten, distributed, re-disseminated, transmitted, displayed, published or broadcast, directly or indirectly, in any medium without the prior written permission of Penton Media.

  UNSUBSCRIBE
  PREFERENCES